Wall ties are small components with a critical structural job: they restrain the outer masonry leaf while allowing the wall build-up and supporting structure to perform as intended. Choosing a tie is only one part of the design. Its type, spacing, embedment, cavity length, substrate and position around openings all need to work together.

This guide summarises the Keyfix guidance in its July 2025 brochure, including the tie-density and spacing method on page 16. It is a design aid, not a project-specific specification or substitute for the applicable standards and manufacturer’s current technical information.

Start with the wall construction

Identify both leaves, the backing structure and the restraint condition before selecting a product. Masonry-to-masonry ties, timber-frame ties, frame cramps and channel restraint systems have different applications and performance criteria. Confirm the tie classification, mortar designation, substrate fixing and cavity dimensions against the project specification and manufacturer’s data.

  • Wall construction and tie type, including whether the backing is masonry, timber, steel or concrete.

  • Cavity width, insulation thickness, residual cavity and any tolerance that affects tie length.

  • Building height, site exposure, wind actions, wall geometry and the restraint at edges and openings.

  • Mortar class, required embedment, movement joints and the sequence of construction.

Tie density and regular spacing

The Keyfix brochure states a baseline density of at least 2.5 ties/m² for masonry leaves that are both 90 mm or thicker. Its corresponding regular arrangement is 900 mm horizontal by 450 mm vertical centres. Ties should be evenly distributed and staggered, except where additional provision is needed around openings and other vulnerable areas.

The spacing must also suit the selected system. For channel ties fixed to steel framing, the brochure uses 600 mm horizontal centres to match typical steel-frame spacing. That arrangement requires at least 3.7 ties/m², with ties evenly distributed and staggered. Timber-frame applications are shown at 4.4 ties/m², using 600 mm horizontal by 375 mm vertical centres. Use the product-specific guidance rather than applying one spacing pattern to every wall.

Calculating density from load

Page 16 gives a two-step method. First calculate the design load carried by the tie array, then determine how many ties are needed using the relevant tie capacity. In the brochure’s example, a Type 1 compressive load of 2,000 N is combined with a channel-system density of 3.7 ties/m², giving 7,400 N/m². Dividing this by the stated tie capacity of 1,580 N gives a calculated requirement of about 4.7 ties/m².

The brochure explicitly says that its worked example omits a safety factor. Treat the figures as an illustration of the arithmetic only. The project designer must establish the design actions, confirm the appropriate design resistance or capacity for the selected tie and substrate, and apply the required factors and design rules. Do not use the example numbers as a project design.

Convert tie density into centres

For a regular rectangular grid, the number of ties per square metre is calculated from horizontal spacing h and vertical spacing v, both in millimetres:

Nt = (1000 / h) × (1000 / v)

Rearranged to find the vertical spacing: v = 1,000,000 / (Nt × h). For the brochure example, h = 600 mm and Nt = 4.7 ties/m² gives v ≈ 355 mm. The brochure then reduces the vertical centres to 300 mm so they coordinate with the 75 mm brickwork height in stretcher bond. This produces a denser arrangement than the calculated minimum, as intended.

Add ties where the wall is more vulnerable

The brochure calls for additional ties next to unbonded edges and around openings. It shows ties at 300 mm vertical centres and no more than 225 mm from an edge. Across the top and bottom of openings, ties are positioned 225 mm from the edge at no more than 450 mm horizontal centres. At vertical movement joints, movement ties are shown at maximum 300 mm vertical centres, with cavity ties no more than 225 mm from the joint and at no more than 300 mm vertical centres. Check the full detail and the project requirements before setting out.

Check embedment and tie length

The brochure cites a minimum embedment of 50 mm into each leaf and recommends design embedments of 62.5 mm for masonry-to-masonry ties and 65 mm for frame-cramp and channel ties. It gives 75 mm as the maximum embedment in the table. Tie length must allow the required embedment while accounting for the actual cavity, insulation and normal site tolerances; embedment markings can help installers achieve the specified position.

Information to confirm before installation

  • The tie schedule matches the wall type, backing structure and project exposure.

  • Horizontal and vertical centres are coordinated with the structural frame, masonry bond and openings.

  • Tie positions remain clear of insulation joints, cavities, movement joints and other interfaces.

  • The selected tie length achieves the required embedment without bridging the cavity or preventing movement.

  • Site installation follows the approved drawings and the manufacturer’s current instructions.

For a project review, provide KBS with the wall build-up, cavity and insulation dimensions, backing structure, building height, location and exposure, opening and movement-joint details, design actions and required quantities. We can help review the appropriate Keyfix wall-tie system and the information needed for a project-specific design.

 
 
 